Planning Documents and Supplementary Information
Drawings
-
01. Site Location
-
02a. Existing Conditions
-
02b. Existing Conditions
-
02c. Existing Conditions
-
02d. Existing Conditions
-
03a. Proposed Conditions
-
03b. Proposed Conditions
-
03c. Proposed Conditions
-
03d. Proposed Conditions
-
04. Cross Sections
-
05. Proposed Site Entrance
-
06. Proposed Office & Welfare Facilities
-
07. Proposed Weighbridge
-
08. Proposed Wheel Wash
-
09. Proposed Waste Inspection Bays & Bunded Quarantine Area
-
10. Proposed Phasing Sequence Plan
-
11. Existing Conditions
-
12. Proposed Conditions
Environmental Impact Assessment Report and Non-Technical Summary
-
Non-Tech Summary
-
EIAR Cover Page and TOC
-
1.0 Introduction
-
2.0 Scope and Methodology
-
3.0 Project Description
-
4.0 Alternatives
-
5.0 Population and Human Health
-
6.0 Ecology and Biodiversity
-
7.0 Land, Geology and Soils
-
8.0 Water
-
9.0 Air and Climate
-
10.0 Noise and Vibration
-
11.0 Cultural Heritage
-
12.0 Traffic and Transport
-
13.0 Landscape and Visual
-
14.0 Material Assets
-
15.0 Interactions, Cumulative and Combined Effects
-
16.0 Mitigation and Monitoring Measures